A catenary failure interrupts the Madrid-Andalusia high-speed line for almost 15 hours News, High Speed, Infrastructure 1-07-2025
Feasibility study awarded to integrate the Torralba-Soria-Castejón line into the HS network Flash, High Speed, Infrastructure 23-06-2025
A minor dies after being electrocuted by the overhead wire at Araia station Flash, Infrastructure 17-06-2025
Santano presents the extension to Vitoria-Gasteiz station Flash, Commuter and Regional, High Speed, Infrastructure, Long Distance, Passenger 16-06-2025
SNCF warns: it needs an extra 1 billion a year to avoid infrastructure collapse Flash, Commuter and Regional, Economy, Freight, Infrastructure, Long Distance, Passenger 10-06-2025
The railway tunneling in Langreo enters into service Flash, Commuter and Regional, Infrastructure, Passenger 9-06-2025
ViaMobilidade orders installation of ETCS level 2 on São Paulo lines 8 and 9 Flash, Infrastructure, Metros 6-06-2025
Environmental green light for electrification between Illescas and Talayuela Flash, High Speed, Infrastructure, Long Distance, Passenger 5-06-2025
Adif will disrupt C-3, C-4 and C-5 lines of Cercanías Madrid this summer for the ‘4+4+2’ Flash, Commuter and Regional, Infrastructure, Passenger 5-06-2025
Adif to reopen the Huesca-Canfranc line on 9 June Flash, Commuter and Regional, Infrastructure, Passenger 27-05-2025
CNMC calls for a 40% cut in Adif and Adif AV access charges Flash, Freight, High Speed, Infrastructure, Passenger 26-05-2025
FGV to start electrification tests between Torrent and Castelló on 28 May Flash, Infrastructure, Metros, Passenger 23-05-2025
Adif awards the renovation projects for the C4 and C7 of the Asturias Cercanías lines Flash, Commuter and Regional, Infrastructure, Passenger 23-05-2025