Completion of the first carbody of the trains on line 7 of the Santiago metro Rolling Stock, Metros 21-07-2025
ViaMobilidade orders installation of ETCS level 2 on São Paulo lines 8 and 9 Flash, Infrastructure, Metros 6-06-2025