Follow the latest railway news on our Telegram channel. Join Now.

Adif moves forward with new maintenance depot in Madrid

Spain’s rail infrastructure manager continues tendering contracts to build new rolling-stock maintenance facilities at Vallecas, Madrid.

Adif moves forward with new maintenance depot in Madrid

José Miguel Vidal | 18-09-2026.

Adif (Administrador de Infraestructuras Ferroviarias) is pressing ahead with the tender process for a new in-house rolling-stock maintenance depot in the Vallecas area of Madrid. To date, the agency has committed around €95 million to the facility itself, associated infrastructure and site security during construction.

The scheme involves demolishing existing structures to erect a new building and laying out two track complexes: a northern set for rolling-stock maintenance and a southern set to interface with the Madrid–Barcelona–French Border high-speed line, including a stub-end (dead-end) siding.

The project also ties in the bypass track to link with the conventional network between Vallecas Industrial and Villaverde Bajo, at the Rebolledo junction, thereby guaranteeing connectivity with the Iberian-gauge network.

Once completed, the new base will upgrade maintenance capacity for Adif’s fleet of more than 600 vehicles operating across both high-speed and conventional lines. The portfolio includes six dual-gauge inspection trains, 47 locomotives and assorted track machinery.

Company: Adif.

Leave a comment

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.