Ouigo denies responsibility for Monday’s incident on the Madrid-Andalusia HSL Flash, Passenger 2-07-2025
A catenary failure interrupts the Madrid-Andalusia high-speed line for almost 15 hours News 1-07-2025
Feasibility study awarded to integrate the Torralba-Soria-Castejón line into the HS network Flash 23-06-2025
SEMAF denounces that Adif is preventing the testing of the S106 improvements News, Passenger, Rolling Stock 18-06-2025
Metrovalencia will restore the València Sud-Castellón section by the end of the month Flash 17-06-2025