Follow the latest railway news on our Telegram channel. Join Now.

Adif awards the renovation projects for the C4 and C7 of the Asturias Cercanías lines

.

Adif has awarded a 5.3 million Euro contract to draft projects for the complete renovation of 112 kilometres of the Cercanías network in Asturias.

The actions will focus on the metric gauge sections Cudillero-Pravia-Gijón (line C4) and San Esteban de Pravia-Pravia-Trubia (line C7).

The estimated investment for the future works exceeds 50 million euros and will include the renewal of the track, electrification, and improvement of elements such as tunnels, overpasses, and signalling systems.

In addition, hydrological studies are envisaged to adapt infrastructures to flood zones and rearrange tracks in stations to increase operability.

These improvements are part of the Asturias Suburban Railway Plan, which already has all its metric gauge line renovations in the project or execution phase. The European Regional Development Fund (ERDF) may co-finance the action.

Trenvista en Telegram

Trenvista en Telegram

The plan includes renovations in the lines Gijón-Laviana, Colloto-Infiesto, Trubia-Collanzo, track duplications in Sotiello-La Florida and La Carrera-Pola de Siero, improvements in signalling, electrification, and removal of level crossings, with investments of more than 1,400 million euros.

Leave a comment

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.